- All
- Consulting
- Contracting
Mapna Group Company
Contract Subject : Contract for implementation of optical fiber cabling operations, supervision of municipal cabling operations and procurement of materials
Operation details:
- Purchase of 2000 meters of optical fiber cable
- Canalization of the 1900-meter-long route is indicated on the attached map
- Cabling 1900 meters long
- Optical fiber jointing between the fiber joint of the Islamic Republic of Iran Railway in Karaj station and the Locomotive Repair Building of Mapna Company
- Cable and joint testing
- Installation…
Railcom Rahbar Company
Contract Subject : Cooperation agreement in engineering services, consulting and supervision of Omid project (International traffic transfer project from Bandar Abbas to Jolfa and Razi through fiber optic railway network)
- Operation details:
- Advice on choosing the place to install the equipment
- Supervising the reconstruction and construction of telecommunication rooms where equipment is installed
- Doing project control
- Tracking the permissions to connect to the infrastructure nodes and use the fibers of the infrastructure company
- Following…
Sharif University of Technology
Project name: Technical consulting services regarding the railway radio communication network of the Islamic Republic of Iran
Service description :
Includes 3 phases:
- Network identification
- Feasibility and economic analysis
- Implementation
Steps to provide services and fulfill obligations:
- Technical consulting services
- Project control and monitoring and reporting
- Economic consulting services
- Preparation of documents and minutes of weekly and monthly meetings
Rightel Communication Services Company
Contract Subject : Implementation of construction operations related to 6 road sites
Description: Installation of 6 BTS on the Tehran-Mashhad railway route
Operation details:
- Leveling and excavation
- Implementation of the full mast foundation
- Implementation of cabinet foundation, electrical panel, fence
- Installation of 48 and 60 meter self-standing mast with accessories and alignment test
- Station fencing
- Grand site network implementation
- Site electrical cabling
- Installation of electrical panel
Sa Iran Telecommunications Industries Company
project subject : Consulting services in the fields of trunking and rail fleet visiting posts
Service description :
- The subject of the intelligent system of rail transport fleet management (tracking)
- The issue of the fleet visiting posts system
Steps to provide services and fulfill obligations:
- Recognizing and defining the problem
- System design
- Estimating the cost of conceptual design
- Conceptual economic studies
Shanghai Eximfree International Trading Co
Subject: Cooperation contract in network design, installation and commissioning of 47 data sites and party lines of the second phase of the Islamic Republic of Iran Railways.
Operation details:
- Design of data network and party line of Sharq, Yazd, Kerman railways of the Islamic Republic of Iran
- Transportation and installation and cabling of equipment in 47 stations
- Setting up data equipment
- Programming of phones, routers and network switches is done according to the design
- Setting…
Rightel Company
Subject : Implementation of construction operations related to 26 road sites
Operation details:
- Leveling and excavation
- Implementation of the full mast foundation
- Implementation of cabinet foundation, electrical panel, fence
- Installation of 48 and 60 meter self-standing mast with accessories and alignment test
- Station fencing
- Grand site network implementation
- Site electrical cabling
- Installation of electrical panel
Tadbir Noor Middle East Company
Subject : Contract for transportation, installation and approval of transmission equipment for 54 sites of Tadbir Middle East Noor Company in the railway project of Sanam Company
Operation details:
- Transportation and installation of STM-16 transmission system equipment at 54 sites in the Tehran-Imam port axis of the Islamic Republic of Iran Railway
- Transportation and installation of STM-64 transmission system equipment in 6 sites in Tehran-Bander Imam axis
- Installation and telecommunication cabling 54 sites
- Ground network…
Subscribe to the site's newsletter
Become a member of Peyvand family to stay up to date with the site's information.